§ 287.101. Determination of powerplant design capacity.

274 words·~1 min read·/us/cfr/t18/s§ 287.101·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

For the purpose of section 103 of the Powerplant and Industrial Fuel Use Act of 1978, a powerplant's design capacity shall be determined as follows:
(a)Steam-electric generating unit. The design capacity of a steam-electric generating unit shall be maximum generator nameplate rating measured in kilowatts or, if the nameplate does not have a rating measured in kilowatts, the product of the generator's kilovolt-amperes nameplate rating and power factor nameplate rating.
(b)Combustion turbine. The design capacity of a combustion turbine shall be its nameplate rating measured in kilowatts, adjusted for peaking service at an ambient temperature of 59 degrees Fahrenheit (15 degrees Celsius) and at the unit's site elevation.
(c)Combined cycle unit. The design capacity of a combined cycle shall be the sum of its combustion turbine nameplate rating measured in kilowatts, based on baseload operation adjusted for site elevation, and the maximum generator nameplate rating measured in kilowatts of the steam turbine portion of the unit.
(d)Internal combustion engine. The design capacity of an internal combustion engine shall be the generator's nameplate rating measured in kilowatts.
(e)Sunsetting provisions. This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly. \[44 FR 38839, July 3, 1979, as amended by Order 914, 90 FR 48404, Oct. 21, 2025\]
Connections3 cite this
Cited by 3 sections · top 2
Citation graph
cites case law
§ 287.101
Determination of powerplant design capacity.
Fed. Reg.×2
C.F.R.×1
Cites 0Cited by 3 across 2 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.